Horizon Middle School

Deserthillstext

Project Description

This new Middle Hills School has a 1075 LF of 32 ft wide roadway consisting of 2” HMAC over 6” base course called “Donatello” Rd. This project also has a 92,000 SF Asphalt Parking Lot with 2” HMAC over 6” base course. The project consisted of concrete pre-cast panel walls with metal studs integrated. Along the HMAC roadway, curbs and gutters were installed as well as 5 ft wide reinforced concrete sidewalks for a total of 2150 LF. Concrete reinforced sidewalks (5 ft wide) were also installed at both parking lot areas as well as curb and gutters. A total of 23 light poles were installed along the roadway and inside the parking lot areas. Al utility U.G was installed as well all signage required and paving striping.

Additional Information

Owner: Clint Independent School District

Location: 300 North Kenazo St., El Paso, TX

Nature of Selection: Project Management at Risk

Total: $14,000,000.00

Completion Date: November 30th 2005