Project Description

This project consisted of developing a 15 acre City of El Paso Park and a new Pre-K thru 5 expandable school to complement a development of approximately 40 acres. The new 40 ft wide roadway (Ted Houghton) consisted of 1440 LF with 2” HMAC over 6” base course. The new City of El Paso Park has an Asphalt Parking Lot consisting of 3800 SF with 2” HMAC over 6” base course. The new Pre-K thru 5 Loma Verde School has another Asphalt Parking Lot consisting of 22,000 SF with 2” HMAC over 6” base course and another Asphalt Parking Lot consisting of 10,000 SF with 2” HMAC over 6” base course. Along the South edge of Ted Houghton, a 5 ft concrete reinforced sidewalk was installed for a total of 1440 LF. All handicap ramps were taken in consideration. Curbs and gutters were installed at all HMAC parking lots. A total of 10 light poles were installed at the parking lots. All required paving striping and signage was installed. All U.G utilities were installed.

Additional Information

Location: 12150 Ted Houghton Dr.

Nature of Selection: Construction Contract – Hard Bid

Total: $9,200,000.00

Completion Date: April 2006